TenderingStage 7
Evaluate bids transparently
Bids as GAEB in. Every line recalculated, bidders checked, price comparison, proposal and evaluation report out.
IN ONE SENTENCE
Jakob recalculates every bid line by line, shows what stands out, knows your experience with each bidder and proposes the best bid.
- Recalculated per VOB/A § 16c
- Price, quality and experience
- Report as Excel
JAKOB FOR TENDERING
The cheapest bid is not always the best. Jakob recalculates every line and weighs price, quality, anything unusual and your experience with each bidder.
Step 01
Read in and recalculate
Every item of every bidder finds its item in your BoQ.

Against your target
Every bid recalculated and set against your cost calculation. You see at once who stands where.
jede Zeile stimmt
Every line recalculated
Quantity times unit price against the total, for every item of every bidder.
Quality checked too
Missing details, alternative offers and reservations in the bid are shown right next to it.
4 Projekte: D19, D22, D24, D25
termintreu, Nachträge 3 %
! Bieter 2 in D22: Nachträge 11 %
Experience with the bidder
How often you have built with the bidder and what went well or not, from your projects.
Step 02
Check per VOB/A
What stands out is on top, before it gets expensive on site.

Prices evaluated transparently
Unit prices of all bidders next to your target. Jakob shows which items make the gap and which price should be clarified.
Lieferzeit Betonstahl nur unter Vorbehalt.
Reservations and partial bids
Reservations, alternative offers and missing lots stand out before the bids are compared.
Outlier prices
Unit prices far from the other bidders’ median stand out, as a reason to ask.
Ranking
By price and after weighing everything: Jakob shows where the order differs and why.
Step 03
Decide with a report
A reasoned proposal with an evaluation report.

Proposal with reasons
Price, quality, anything unusual and your experience per bidder side by side. Plus the points for the bidder meeting and the evaluation report.
Opportunities and risks
Per bidder: where they are cheap, where a claim is likely and which price should be clarified.
Reasons to read
For every bidder it says why they rank where they do. Traceable for client and team.
1 · Bieter 1: Nachlass 1,5 % → 2.260.500 €, damit auch der günstigste
2 · Bieter 2: Betonstahl 1.320 €/t bestätigen lassen
Negotiate prepared
Jakob suggests which prices to clarify and where a discount changes the ranking.
Frequently asked questions
Which files does Jakob need?
Your BoQ as GAEB (X83 or X81) and the bidders’ offers as GAEB (X84). Jakob also reads the older GAEB 2000 format (P83, P84).
How does Jakob know the bidders’ quality?
From your projects in the Company Brain: awards, claims, schedules, defects and lessons learned.
What happens with an arithmetic error?
The unit price applies under VOB/A § 16c. Jakob corrects the total, shows the line and whether the ranking changes.
Who decides on the award?
You. Jakob only makes a reasoned proposal.
Does the report match our template?
The report follows the structure of an evaluation report with cover sheet, report, bidders, bidder details and changes. We set up your own template once.